Parkside, Heathside and Lethbridge Blackheath, Lewisham

Residential

Overview

Tullys has provided pre-planning and detailed design services on this major regeneration scheme. Consisting of six phases providing over 1200 mixed tenure residential units, 512m2 of retail space, 768m2 of community floor space, along with cycle parks, associated highway infrastructure and public realm works.

Significant Phasing Challenges in Former Quarry.

The site was formally a sand and chalk quarry with elevated boundary levels and a history of subsidence. Innovative proposals on site levels and road layouts during master planning have accommodated stringent planning constraints, considerably elevating the sites. This created significant level differences along phasing boundaries where a variety of temporary and permanent retaining structures were developed by Tullys.

Project information

Client
Peabody
Ardmore Construction
Rydon

Architect
BPTW

Services

RIBA Stages 2-6
Structural Engineering
Civil Engineering
Pre-Planning
Flood Risk Assessment

Related projects

Gascoigne Estate, Barking
Myatt’s Field and Community Centre
Merrick Place, Southhall